Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2007 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
THARVISO |
Approved |
Entered by JFEMLIN1 - PLAN No.: I-2005-046 |
| 05/23/2007 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
THARVISO |
Approved |
Entered by THAUSER1 - I-2005-046 |
| 05/22/2007 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
THARVISO |
Partial Approval |
Entered by THAUSER1 - I-2005-046
THIS OFFICE HAS INSPECTED SYCAMORE PARK, VILLAGE 3 AND FOUND THE PROJECT COMPLETED AND IN SUBSTANTIAL CONFORMANCE. THE ENGINEER-OF-RECORD HAS SUBMITTED THE ORIGINAL "AS BUILT" MYLARS SHOWING ANY REVISIONS AND/OR CHANGES TO LINE AND GRADE.
ADDITIONALLY, THE PRIVATE IMPROVEMENT AGREEMENT (PIA) REQUIRED THE IWNER/DEVELOPER TO PAY ANY APPLICABLE FEES FOR ONSITE ROADWAY TREATMENT (AT A MINIMUM FOG COAT). AN OFFSITE ROADWAY SURFACE TREATMENT MAY BE REQUIRED DEPENDING ON FIELD CONDITIONS. PLEASE SUBMIT FOG COAT FEES OF $13,077.75. THE FEES SHALL BE PAID TO THE CITY OF TUCSON, DEPARTMENT OF TRANSPORTATION (DOT) PRIOR TO ACCEPTANCE FOR MAINTENANCE AND OPERATION.
A LETTER OF ACCEPTANCE FROM THE ENGINEERING DIVISION WILL FOLLOW AFTER THE RECEIPT OF TH APPLICABLE SURFACE TREATMENT FEES. |
| 08/19/2009 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
TSTOCKETT |
Approved |
Entered by KMEDINA1 - I-2005-046 SEE SIRE |
| 08/01/2006 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
TSTOCKET |
Approved |
Entered by JFEMLIN1 - PLAN No.: I-2005-046, Village 3 |
| 06/06/2007 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
TSTOCKET |
Partial Approval |
Entered by THAUSER1 - I-2004-051 OFFSITE
APPROVAL |
| 09/19/2007 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
TSTOCKET |
Denied |
Entered by THAUSER1 - I-2005-050 OFFSITE
TWO 25-MPH SPEED LIMIT SIGNS AND POSTS ARE ON THE GROUND AND NEED TO BE REINSTALLED:
1. THE EASTBOUND 25-MPH SIGN-POST ON SYCAMORE PARK BOULEVARD, APPROXIMATELY 100 FEET EAST OF RED OAK ROAD IS DOWN.
2. THE WESTBOUND 25-MPH SIGN-POST EAST OF 7517 E SYCAMORE PARK BOULEVARD IS DOWN AND NEEDS TO BE REISTALLED. (NOTE: REINSTALL THIS SIGN AND POST 35 FEET EAST OF ABOVE ADDRESS). |
| 09/19/2007 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
TSTOCKET |
Partial Approval |
Entered by THAUSER1 - I-2005-046 |