Case: S04-077

Parcel: 141250050


Addresses:

7248 E VOYAGER RD


Inspection Status: Passed

Inspection History: COT - ENGR - Site - Assurance Release

Plan Number - S04-077

Inspection Description - COT - ENGR - Site - Assurance Release

Inspection Status - Passed

Date Description Inspector Results Comments
04/22/2020 COT - ENGR - Site - Assurance Release DROBERTS Approved Entered by DROBERT5 -
11/24/2009 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - DROVE THROUGH THE SITE TO SEE WHAT TYPE OF WORK IS ON-GOING AT THIS TIME. THE DEVELOPER CONTINUES TO WORK ON 3 LOTS AT THIS TIME, LOTS #137, #140, AND #141. THIS SITE WILL BE CHECKED AGAIN IN THE FUTURE TO SEE IF IT IS APPROACHING THE 75% RELEASE RATE.
05/22/2008 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THE SITE HAS BEEN CHECKED AND THE FOLOWING LOTS HAVE BEEN FOUND TO EITHER BE UNDER CONSTRUCTION OR NOT DEVELOPED ON AT THIS TIME: Sycamore Park Village 2, S04-077: Lots #1-31, 85-146, plus 3 survey monuments. 93 lots not constructed on at this time, that is 37% of the site constructed on, approximately 50 more houses remaining in the 75% initial release. Should not need a completion bond at this time.
12/21/2007 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - A MEETING WAS HELD ON-SITE NICHOLE KALAHAR-ZORMEIER, NICOLE CANTALICIO, SEAN RICH AND MYSELF TO DISCUSS THE RELEASE OF THE ASSURANCES AND THE GRADING PERMIT. THEY WILL ADDRESS ALL ITEMS THAT HAVE BEEN NOTED IN PREVIOUS INSPECTIONS PRIOR TO SCHEDULING FOR OTHER INSPECTIONS. CLARIFICATIONS HAVE BEEN MADE ON WHAT WE ARE ASKING TO BE COMPLETED AT THIS TIME, BUT THE DEVELOPER DOES FEEL THAT PORTIONS OF THE ITEMS ARE PART OF DIAMOND VENTURES ORIGINAL CONTACT. I HAVE ADVISED THEM TO ADDRESS ALL ITEMS ON THE PREVIOUS PUNCHLIST, AND IF THEY FEEL THAT SOMETHING BELONGS TO SOMEONE ELSE REFERENCE THAT IN THEIR LETTER. ALSO WE WILL NEED AS-BUILT DRAWINGS FOR ALL ITEMS THAT HAVE BEEN CHANGED.
10/24/2007 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE FINAL RELEASE OF THE ASSURANCES AND THE FOLLOWING ITEMS HAVE BEEN NOTED AS NEEDING ATTENTION. 1) SEDIMENT HAS BEEN NOTED ON THE BOTTOM OF THE DETENTION BASIN AND WITHIN THE DRAINAGE STRUCTURE, PREVENTING PROPER PERCOLATION OF THE BASIN WITHIN THE REQUIRED TIME FRAME. THERE HAS BEEN EROSION NOTED ALONG THE PERIMETER OF THE BASIN IN BOTH OPEN AREAS AS WELL AS ADJACENT TO THE REAR WALL OPENINGS, CORRECT ALL REMAINING DRAINAGE ISSUES. THE CONTINUAL EROSION HAPPENING DURING RAINS IN THESE AREAS CONTRIBUTES TO THE SEDIMENT ON THE BASIN BOTTOM, WHICH RESTRICTS THE PERCOLATION RATES. 2) PROVIDE A COMPLETION BOND FOR ALL REMAINING LOTS AND ASSURABLE ITEMS THAT HAVE NOT BEEN CONSTRUCTED AT THIS TIME. AS WELL AS AN ITEMIZED LIST OF ALL ITEMS FIGURED WITHIN THE BOND CALCULATION FIGURES. IF THE LOTS ARE BEING TURNED OVER TO ANOTHER DEVELOPER A SUBSTITUE ASSURANCE MAY BE NEEDED FROM THAT DEVELOPER. CURRENTLY 93 LOTS HAVE NOT BEEN CONSTRUCTED ON AT THIS TIME, CONTACT TAMI HAUSER AT 837-4916 TO VERIFY WHAT IS NEEDED TO CLOSE OUT THIS PROJECT AS IT IS ON THIS DATE. 3) SURVEY MONUMENTS HAVE NOT BEEN COMPLETED FULLY ON THIS SITE AND WILL NEED TO BE COMPLETED PRIOR TO THE FINAL RELEASE. VERIFY THAT ALL OF THE MONUMENTS ARE IN PER THE APPROVED PLANS AT EACH AND EVERY LOCATION PRIOR TO CALLING FOR ANOTHER INSPECTION. 4) GENERAL CLEAN-UP OF THE SITE AND ITS PERIMETERS OF ALL CONSTRUCTION TRASH AND DEBRIS IS REQUIRED. THIS WILL INCLUDE ALL OF THE REMAINING STORMWATER CONTROLS THAT ARE NOT NEEDED AT THIS TIME. CONTACT LAITH ALSHAMI AT 837-4933 WITH THE C.O.T. ENGINEERING SECTION TO VERIFY WHAT AREAS WILL NEED TO REMAIN INPLACE UNTIL THE SITE HAS EITHER BEEN STABALIZED FULLY OR CONSTRUCTED UPON. 5) ENSURE THAT A BASIN CERTIFICATION LETTER IS ON FILE WITH TAMI HAUSER FOR THIS SITE.
10/09/2007 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - SEE PREVIOUS COMMENTS DATED 5/04/2007 FOR THE FINAL RELEASE OF THE ASSURANCES FOR THIS SITE.
05/04/2007 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE FULL RELEASE OF THE ASSURANCES AND THE FOLLOWING ITEMS WERE FOUND TO BE INCOMPLETE AT THIS TIME. 1) PROVIDE A ESTIMATE FOR A COMPLETION BOND FOR ALL OF THE REMAINING ASSURABLE ITEMS THAT ARE NOT COMPLETE AT THIS TIME. THIS WILL INCLUDE BUT IS NOT LIMITED TO SIDEWALKS, DRIVEWAYS, ECT.. 2) COMPLETION OF AND GENERAL CLEANUP IS REQUIRED IN ALL COMMON AREAS PRIOR TO THE FINAL RELEASE OF THE GRADING PERMIT. THIS WORK SHOULD NOT BE COMPLETED UNTIL ALL OF THE SITES AROUND THE COMMON AREA HAVE BEEN COMPLETED TO ENSURE NO SEDIMENT IS LEFT IN THE BASINS. THIS WILL INCLUDE ALL DRAINAGE STRUCTURES THAT ARE LOCATED WITHIN THE BOUNDARIES OF THIS SITE. THIS WILL INCLUDE ALL DRAINAGE STRUCTURES THAT ARE LOCATED WITHIN THE BOUNDARIES OF THIS SITE. 3) A BASIN CERTIFICATION LETTER IS REQUIRED FOR THIS PROJECT. THIS LETTER NEEDS TO SPECIFY NOT ONLY THAT THE ITEMS HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS, BUT THAT THEY PERFORM AS SPECIFIED BY THE APPROVED DRAINAGE REPORT AND THE PIMA COUNTY/CITY OF TUCSON RETENTION/DETENTION MANUAL. PONDING WATER HAS BEEN NOTED IN THE LARGE COMMON AREAR "A" LOCATED AT THE SOUTHWEST CORNER OF VILLAGE #2 ACROSS FROM LOT #18 OF VILLAGE #3. 4) REPAIR ALL EROSION WITHIN THE BOUNDARIES OF SYCAMORE PARK VILLAGE 2, THIS SITE WILL BE CHECKED PRIOR TO THE RELEASE OF THE GRADING PERMIT.
06/29/2006 COT - ENGR - Site - Assurance Release DROBERTS Partial Approval Entered by DROBERT2 - I CHECKED THIS SITE FOR THE INITIAL RELEASE OF THE LOTS FOR SALE. THE FOLLOWING ITEMS HAVE BEEN NOTED: 1) THE ROADWAYS, CURBS, AND UTILITIES HAVE BEEN COMPLETE TO THE PONT OF RELEASE. aLL ITEMS WILL NEED TO BE COMPLETED PRIOR TO THE FINAL RELEASE OF THE ASSURANCES. 2) THE DRAINAGE WAYS AND BASINS HAVE BEEN CONSTRUCTED BUT ARE NOT COMPLETE AT THIS TIME. 3) MINOR PONDING HAS BEEN NOTED IN ALL OF THE BASINS AT THIS TIME. THESE WILL BE CHECKED IN THE FUTURE TO ENSURE THAT THEY ARE DRAINING ACCORDING TO THE APPROVED DRAINAGE REPORT. 4) THE FINAL GRADING INSPECTION NEEDS TO BE COMPLETED PRIOR TO THE RELEASE OF ANY LOTS PAST THE 75% INITIAL RELEASE, PLEASE SCHEDULE THIS INSPECTION.