Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Plan Number - S04-070
Inspection Description - TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/26/2008 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | TSTOCKET | Approved | Entered by THAUSER1 - I-2005-043 |
03/14/2008 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | THARVISO | Approved | Entered by SMONTIE1 - PLAN NO. : I-2005-043 |
03/03/2008 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | THARVISO | Partial Approval | Entered by SMONTIE1 - PLAN NO. : I-2005-043 This office has inspected Corona Road Estates and found the project completed and in substantial conformance. The Engineer-of-Record must submit the original "As Built" Mylars showing any revisions and/ or changes to line grade prior to acceptance by the City of Tucson for maintenance and operation. Additionally, the Private Improvement Agreement (PIA) requires the owner/ developer to pay any appicable fees for onsite roadway surface treatment ( at a minimum fog coat). An offsite roadway surface treatment may be required depending on field conditions. Please submit fog coat fees of $2705.27. The fees shall be paid to the City of Tucson, Department of Transportation (DOT). A letter of acceptance from the Engineering Division will follow after the receipt of the Mylars and applicable surface treatment fees have been paid. Please contact Traffic Engineering for any outstanding obligations pertaining to Traffic signage and striping. |