Inspection History Details
Inspection Status: Approved
Inspection History: ASSURANCE - DSD
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2006 | ASSURANCE - DSD | Approved | CHECKED THROUGH THE SITE TO ENSURE THAT ALL ITEMS HAVE BEEN COMPLETED PER THE APPROVED PLANS. MINOR DEBRIS CLEANUP IS NEEDED IN THE BASIN AND DRAINAGE WAYS, AND A PEDESTRIAN PATHWAY HAS NOT BEEN FULLY COMPLETED AT THIS TIME. THESE ITEMS WILL BE HELD AGAINST THE FINAL GRADING PERMIT FOR THIS SITE, IT WILL NOT BE RELEASED UNTIL THESE ITEMS HAVE BEEN COMPLETED AND ACCEPTED. | |
| 06/12/2006 | ASSURANCE - DSD | Partial Approval | THIS SITE WAS CHECKED FOR THE FINAL RELEASE OF THE ASSURANCES, THE FOLLOWING ITEMS HAVE BEEN FOUND TO INCOMPLETE AT THIS TIME. 1) A COMPLETION BOND IS REQUIRED FOR ALL REMAINING SIDEWALKS AND DRIVEWAYS93 LOTS). 2) A CERTIFICATION LETTER FOR ALL DRAINAGE WAYS, BASINS, AND DRAINAGE INLET/OUTLET STRUCTURES LOCATED ON THIS SITE FROM THE SIGNING ENGINEER. 3) COMPLETE THE FINAL GRADING INSPECTION FOR THIS PROJECT PRIOR TO ASKING FOR THE FINAL RELEASE. 4) PROVIDE SOME NOTIFICATION FROM THE TRANSPORTATION DEPARTMENT THAT ALL OF THE REQUIRED PRIVATE IMPROVENT AGREEMENT WORK IS ACCEPTED. |
|
| 04/14/2006 | ASSURANCE - DSD | Partial Approval | THE FOLLOWING HAS BEEN COMPLETED AT THIS TIME: UTILITIES, CURBS, AND ROADWAYS, SURVEY MONUMENTATION SIGNS, DRAINAGE INLET STRUCTURES, DRAINAGE WAYS & BASINS, AND COMMON AREA "C". 1) THE SIDEWALKS AND DRIVEWAYS HAVE BEEN COMPLETED EXCEPT FOR THE FOLLOWING LOTS: 31-38, 42 & 43, AND 45, WHICH WILL REQUIRE A COMPLETION BOND PRIOR TO THE FINAL RELEASE OF THE ASSURANCES. 2) A BASIN CERTIFICATION LETTER WILL BE REQUIRED BY THE SIGNING ENGINEER PRIOR TO THE FINAL RELEASE OF THE ASSURANCES. 3) FULL COMPLETION OF THE RETENTION/DETENTION BASIN WILL BE REQUIRED FOR THE FOLLOWING AREAS; A) THE SLOPES WEST OF THE INLET STRUCTURE ARE LOOSE AND NOT COMPACTED. DRAINAGE OPENNINGS IN THE BASIN FROM THE ADJACENT LOTS DO NOT HAVE ANY TYPE OR EROSION PROTECTION TO PREVENT CUTTING DURING LOCAL STORMS. VARIOUS TYPES OF EROSION PROTECTION MATERIALS HAVE BEEN UTILIZED IN THE PAST TO KEPP THIS DAMAGE TO A BARE MINIMUM, PLEASE CONSULT THE SIGNING ENGINEER FOR A LIST OF MATERIALS THAT ARE SUITABLE FOR THIS SITE. A RE-INSPECTION OF THIS SITE WILL BE REQUIRED PRIOR TO THE FINAL RELEASE OF THE ASSURANCES, OF THE RELEASE OF THE GRADING RESEEDING BOND FOR THE CURRENT GRADING PERMIT. |
|
| 08/03/2005 | ASSURANCE - DSD | Partial Approval | PARTIAL RELEASE OF THE SITE APPROVED AT THIS TIME, ALL ROADWAYS AND UTILITIES ARE COMPLETE AT THIS TIME. THE DRAINAGEWAYS AND BASINS HAVE BEEN ROUGHLY CONSTRUCTED, NO SIDEWALK OR DRIVEWAYS FOR ANY LOCATION AT THIS TIME. ADDITIONAL INSPECTIONS REQUIRED PRIOR TO FUTURE RELEASES. | |
| 07/12/2005 | ASSURANCE - DSD | Denied | THIS SITE IS DENIED AT THIS TIME UNTILTHE ROADWAY WORK ON BILBY IS COMPLETE. |