| 01/10/2013 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/30/2010 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by DROBERT2 - THE FOLLOWING INFORMATION HAS BEEN PROVIDED BY THE CONTRACTOR AND VERIFIED BY MYSELF TO REPRESENT THE ITEMS THAT APPEAR TO BE INSUFFICIENT AT THIS TIME.
Here are the numbers that you will be asking about for the bound amount:
$128,360.00 ORIGINAL REMAINING ASSURE ABLE ITEMS
$ 24,000.00 MISCELLANEOUS WORK AND REPAIRS
$152,360.00 TOTAL COST
$ 5,000.00 MOBILIZATION
$157,360.00 TOTAL
$ 23,604.00 15% CONTINGENCY
$170,964.00 FULL CASH BOND COST FOR THIS SITE.
This is what you can expect to pay for the release of the site, this will remain in place until all of the project has been completed and accepted. Prior to the release of this bond you will be required to provide a Certification Letter from the Engineer of Record that the site has been constructed per the approved plans, this will include "Final Plat", "Grading", "As-built Drawings", "P.I.A. (Private Improvement Agreement), and any other approved set of plans. As-built Drawings will have to be submitted and approved by this department for all changes that have been made to this site since the original plans were approved. We will inspect all aspects of this site to ensure that all of the assure able items have been completed, that the basins are constructed as noted in the certification letter from the Engineer of Record and that they function in the given time frame as specified in the Pima County / City of Tucson Retention/Detention Manual. I will provide this inspection upon your request once all of the correct information has been provided.
ALL WORK WILL BE RE-INSPECTED PRIOR TO THE FINAL RELEASE OF ALL BONDS FOR THIS SITE. |
| 12/08/2009 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by DROBERT2 - I WENT THROUGH THE SITE TODAY AND NOTED WHAT LOTS HAVE BEEN COMPLETED AND WHAT LOTS REMAIN UNDEVELOPED. I HAVE CONTACTED PATRICK PITMAN(312-7887) <patrickp@habitattucson.org AND ADVISED HIM THAT I HAVE COMPLETED THIS COUNT AND WILL BE WAITING UNTIL HE PROVIDES ME WITH THEIR INFORMATION BEFORE WE CAN DETERMINE A COMPLETION BOND AMOUNT. PATRICK DID SHOW UP TO THE SITE BY THE TIME THAT I LEFT AT 1:30, SO I CALLED HIM AND LEFT A MESSAGE THAT I HAVE COMPLETED MY COUNT OF UNDEVELOPED SITES. THE FOLLOWING LOTS ARE IN THE CURRENT CONDITIONS AS NOTED UNDEVELOPED LOTS: 2-5, 15, 49-51, 109-115, 137-140, 142-144, 150-151, 155, 1578, 162-169, 172-173, 175-176, 180, 184-189, 191-194, 196-198, 201-204, 220-240, 244, 247, 249-256, 262-264, 267, 270-271, 277, 279, 281, 283, 295, 319-320, 334-337, 373, AND 391. UNDER CONSTRUCTION: 108, 121-124, AND 141. |
| 12/07/2009 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by DROBERT2 - HAVE ARRANGED AN ON-SITE MEETING WITH PATRICK PITMAN(312-7887) <patrickp@habitattucson.org TO DISCUSS THE RELEASE OF THE ASSURANCES. I HAVE ADVISED HIM THAT THERE SITE IS NOT COMPLETE SO THEY WILL HAVE TO PLACE A COMPLETION BOND FOR ALL REMAINING ASSURABLE ITEMS. PATRICK WILL WORK ON PROVIDING US A TABULATION SHEET OF ALL THE REMAINING ASSURABLE ITEMS FOR THE SITES THAT THEY HAVE POSSESSION OF. ONCE THIS HAS BEEN PROVIDED WE WILL VERIFY HOW MUCH OF A CASH BOND WILL BE REQUIRED PRIOR TO RELEASING THE ASSURANCES TOTALLY. |
| 11/08/2007 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by DROBERT2 - THIS SITE WAS CHECKED FOR PROGRESS OVER THE PAST 12 MONTHS.
THE FOLLOWING LOTS HAVE EITHER BEEN COMPLETED OR ARE UNDER CONSTRUCTION AT THIS TIME: 1, 6-76, 78-107, 125, 130-136, 145-148, 152-154, 156 & 157, 159-161, 170 & 171, 178 & 179, 181 & 182, 195, 199 & 200, 205-211, 216-219, 241-243, 245 & 246, 257-261, 265, 266, 268, 269, 272-276, 278, 280, 282, 284-294, 296-318, 321-333, 338-372, 374-382, 384-390, 392, 393.
THE FOLLOWING LOTS ARE CURRENTLY UNDEVELOPED AT THIS TIME: 2-5, 77, 108-124, 126-129, 137-144, 149-151, 155, 158, 162-169, 172-177, 180, 183-194, 196-198, 201-204, 212-215, 220-240, 244, 247-252, 253-256, 262-264, 267, 270, 271, 277, 279, 281, 283, 295, 319, 320, 334-337, 373, 383, 391,
THIS SITE WILL BE CHECKED IN ANOTHER 30 DAYS AND THE NOTED CHANGES TO THE ABOVE LIST WILL BE MADE AT THAT TIME. |
| 02/01/2006 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by THAUSER1 - SITE READY FOR INITIAL RELEASE OF ALL AREAS WHERE THE ROADWAYS HAVE BEEN COMPLETED AT THIS TIME. SEE ATTACHED SHEET. ANOTHER INSPECTION WILL NEED TO BE SCHEDULED PRIOR TO PASSING 75% RELEASE. |
| 11/30/2006 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by DROBERT2 - THE SITE HAS BEEN CHECKED FOR THE FULL RELEASE OF THE ASSURANCES, BUT IS NOT READY AT THIS TIME. ON THIS PROJECT THERE HAVE BEEN PROBLEMS ARISE IN REGARDS TO THE DRAINAGEWAYS AND BASINS LOCATED WITHIN THE PROJECT LIMITS. I HAVE BEEN ADVISED THAT THE ENGINEER OF RECORD HAS SUBMITTED SOME MODIFICATIONS OF THE PLANS FOR PORTIONS OF THE PROBLEMS ON THIS SITE, BUT RESOLUTION HAS NOT BEEN REACHED FULLY AT THIS TIME. AT THIS TIME IT IS MY RECOMMENDATION THAT ALL LOT RELEASE REQUEST BE CHANNELED THROUGH ELIZABETH EBERBACH TO ENSURE THAT WE DON'T RELEASE LOTS THAT MAY BE ASSOCIATED WITH DRAINAGE ISSUES. |
| 05/01/2006 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by DROBERT2 - THIS SITE HAS BEEN CHECKED AND FOUND TO BE READY FOR THE PARTIAL RELEASE OF THE FOLLOWING LOTS. ALL OTHER LOTS THAT CAN NOT BE RELEASED AT THIS TIME ARE AS FOLLOWS, AND WILL NEED ANOTHER INSPECTION PRIOR TO THEIR RELEASE. |
| 08/31/2005 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Denied |
Entered by DROBERT2 - SEE ABOVE NOTED COMMENTS |
| 08/26/2005 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Denied |
Entered by DROBERT2 - SITE NOT READY AT THIS TIME, THE DEVELOPER IS STARTING WORK ON THE INSTALLATION OF THE UTILITIES. THIS SITE WILL BE CHECKED WEEKLY UNTIL THE WORK IS COMPLETE AND READY FOR THE INITIAL RELEASE OF THE SITE. |
| 01/02/2025 |
COT - ENGR - Site - Assurance Release |
|
Passed |
Thera are a few damaged areas and raised sidewalks in common areas but it was build as intended to plan. |