Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ASSURANCE - DSD
Plan Number - S04-003
Inspection Description - ASSURANCE - DSD
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/29/2012 | ASSURANCE - DSD | Approved | ||
08/06/2007 | ASSURANCE - DSD | Partial Approval | THE SITE HAS BEEN INSPECTED FOR THE FINAL RELEASE OF THE ASSURANCES, AND IS DENIED AT THIS TIME. A SET OF AS-BUILT DRAWINGS IS NEEDED TO COMPLETE THE FINAL INSPECTION BOTH FOR THE ASSURANCES AND THE FINAL GRADING OF THE SITE. ADDITIONAL RELEASES FOR THIS SITE WILL BE HELD UNTIL THIS SET OF DOCUMENTS HAVE BEEN PROVIDED. ALSO THE FOLLOWING LOTS ARE EITHER UNDER CONSTRUCTION AT THIS TIME OR WILL BE CONSTRUCTED ON IN THE FUTURE AND WILL NEED A COMPLETION BOND TO ACHIEVE A FULL RELEASE OF THE ASSURANCES: 1-4, 158-172, 184-189, 219, 232, 234-237, 243-245, 264-265, 268-269, 294-296, 310-311, 451-458. THIS LIST OF INDEFICIENT ITEMS ARE NOT FINAL, ADDITIONAL ITEMS MAYBE REQUIRED ONCE A FULL INSPECTION HAS BEEN COMPLETED ON THIS SITE WITH THE REVISED DRAWINGS. THERE IS A CERTIFICATION LETTER REQUIRED ON ALL DRAINAGE WAYS AND BASINS FOR THIS SITE. PLEASE FEEL FREE TO CONTACT DAVID ROBERTS AT 349-7643 IF YOU HAVE ANY QUESTIONS. | |
05/03/2006 | ASSURANCE - DSD | Partial Approval | NO CHANGES HAVE BEEN MADE ON THE COMPLETION OF ADDITIONAL ROADWAYS AT THIS TIME. PLEASE SEE THE ATTACHED PLAT SHEETS TO VERIFY WHAT AREAS ARE RELEASEABLE AT THIS TIME. A COMPLETION BOND WILL BE REQUIRED FOR ANY LOT RELEASES PAST THE 75%, AS WELL AS ANOTHER ON-SITE INSPECTION TO VERIFY THE BOND QUANTITIES. | |
03/14/2006 | ASSURANCE - DSD | Partial Approval | THE FOLLOWING ITEMS HAVE BEEN COMPLETED AT THIS TIME: ROADWAYS, CURBS, UTILITIES, AND SURVEY MONUMENTS IN THE COMPLETED SECTIONS OF THE ROADWAYS, THIS APPEARS TO BE APPROXIMATELY 50 % OF THE SITE. SEE THE ATTACHED PLAT SHEETS TO SEE WHAT AREAS HAVE BEEN COMPLETED AT THIS TIME. THE COMMON AREAS HAVE BEEN CUT TO A ROUGH STATE BUT STILL NEED TO BE COMPLETED PRIOR TO THE FINAL RELASE. A COMPLETION BOND WILL BE NEEDED FOR THIS SITE IF THE DEVELOPER IS SEEKING A FULL RELEASE OF THE ASSURANCES. THEY WILL NEED TO PROVIDE TO US A FULL LIST OF THE ITEMS THAT WILL BE BONDED, SHOWING THE QUANTITIES AND THE LOCATIONS OF EACH ITEM SO THAT WE MAY VERIFY THE QUANTITY OF WORK REMAINING. ANOTHER INSPECTI0N NEEDS TO BE SCHEDULED PRIOR TO THE RELEASES REACHING 75% OF THE SITE. |