Inspection Status: Approved
Inspection History: ASSURANCE - UTILITY SERVICES
| Date |
Description |
Inspector |
Results |
Comments |
| 09/07/2017 |
ASSURANCE - UTILITY SERVICES |
|
Approved |
I CONTACTED JEFF DRUMM (520) 837-2101 AND RAY MUNOZ (520) 837-2207 WITH THE TUCSON WATER DEPARTMENT AND HAVE BEEN ADVISED THAT THE WATER FOR THE UNITS ARE A DIRECT TAP ONTO THE 8 INCH MAIN THAT IS UNDERNEATH PASTTIME ROAD. THE INSTALLATION OF ADDITIONAL METER WILL BE ADDED PER A SEPERATE PERMIT FOR THE UNITS |
| 09/01/2017 |
ASSURANCE - UTILITY SERVICES |
|
Partial Approval |
STILL WAITING FOR INFORMATION FROM THE TUCSON WATER DEPARTMENT FOR THE ACCEPTANCE OF MAINTENANCE FOR THIS SITE. |