Inspection Status: Passed
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
| Date |
Description |
Inspector |
Results |
Comments |
| 10/19/2004 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
RLEIGH |
Approved |
Entered by THAUSER1 - I-2004-006 |
| 06/17/2004 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
RLEIGH |
Denied |
Entered by THAUSER1 - I-2004-006
THIS OFFICE INSPECTED THE SUBJECT PORJECT ON JUME 17, 2004 AND FOUND THE FOLLOWING ITEMS IN NEED OF ATTENTION. PLEASE CONSIDER THSI LETTER THE PUNCH LIST OF ITEMS TO BE ADDRESSED/RECTIFIED PRIOR TO THE ACCEPTANCE OF IMPROVEMENTS IN THE PUBLIC RIGHTS-OF-WAY BY THE CITY OF TUCSON FOR MAINTENANCE AND OPERATION. FUTURE INSPECTIONS WILL REQUIRE A LETTER OF CERTIFICATION THAT ALL PUNCH LIST ITEMS HAVE BEEN RESOLVED BY THE ENGINEER OF RECORD. IN ADDITION TO THE FOLLOWING ITEMS, TRAFFIC ENGINEERING MAY HAVE ADDITIONAL PUNCH LIST ITEMS PERTAINING TO TRAFFIC SIGNAGE AND STRIPING.
1) PLEASE INSURE THAT THE RIGHT-OF-WAY EXCAVATION PERMIT IS CURRENT PRIOR TO WORKING ON ANY PUNCH LIST ITEMS. IF THE PERMIT IS EXPIRED, A NEW PERMIT FOR THE P.I.A IS REQUIRES PRIOR TO ANY REMEDIAL WORK OR RE-INSPECTION OF THE SUBJECT PROJECT.
2) REMOVE DIRT AND DEBRIS FROM ALL STREET AND CURB AREAS. FUTURE INSPECTIONS MAY PRODUCE ADDITIONAL PUNCH LIST ITEMS.
3) REPAIR ALL GOUGES IN THE PAVEMENT AREA.
4) COMPLETE CONSTRUCTION OF SIDEWALK ABUTTING COMMON AREAS.
5) REPAIR GAP BETWEEN MULTI-USE PATH ASPHALT AND HEADER AT STA.1+70, 15'RT AND LT (COWS HEAD SADDLE LANE).
6) MULTI-USE PATH AND TOP OF ADJOINING SIDEWALK ARE NOT FLUSH AT STA 1+75, 24' LT (COWS HEAD SADDLE LANE).
7) THERE APPEARS THAT THERE MAY BE A PONDING PROBLEM AT A LOW POINT ON COWS HEAD SADDLE LANE (STA 2+13). THE CONFIGURATION OF THE ROADWAY MAY ALLOW WATER TO POND IN THE ROADWAY AND SIDEWALK AREA. PLEASE EVALUATE THIS SITUATION AND SUBMIT A SOLUTION TO THIS PROBLEM.
8) STRESS CRACKS HAVE DEVELOPED AT NUMEROUS LOCATIONS IN THE ASPHALT OF THE MULTI-USE PATH AND DEBRIS IS SHOWING THROUGH ONE LOCATION. PLEASE EVALUATE THIS PROBLEM AND SUBMIT YOUR FINDINGS AND A SOLUTION TO IT. ADDITIONALLY, PROVIDE ASPHALTIC CONCRETE TEST DATA INCLUDING ALL COMPACTION TESTING FOR MULTI-USE PATH. SURVEILLANCE NOTES DID NOT INDICATE WHEN PATH WAS PAVED FO ASPHALT TESTING DATA SUBMITTED COULD NOT BE MATCHED.
9) DG TRAIL AND MULTI-USE PATHS ARE NOT FLUSH WHERE THEY CONVERGE AT THE SOUTH END OF PATH.
10) SAFETY RAILING WILL BE REQUIRED AT ANY AREA WHERE SIDEWALK IS ADJACENT TO A SLOPE GREATER THAN 3:1. SPECIFICALLY AT SIDEWALK SCUPPERS AND BETWEEN LOTS 15 & 16. |
| 10/19/2008 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
TSTOCKET |
Partial Approval |
Entered by THAUSER1 - I-2004-006
60 DAY APPROVAL |
| 06/17/2004 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
TSTOCKET |
Partial Approval |
Entered by THAUSER1 - I-2004-006
60 DAY APPROVAL |