Inspection Status: Partial Pass
Inspection History: COT - ENGR - Site - Assurance Release
| Date |
Description |
Inspector |
Results |
Comments |
| 04/22/2004 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Denied |
Entered by THAUSER1 - CURBS HAVE BEEN INSTALLED AT THIS TIME ALONG WITH THE UTILITIES. ROADWAYS HAVE NOT BEEN SOMPLETED. CONTRACTOR IS LAYING THE ASPHALT AND ROADWAY ON THIS DATE, BUT IS NOT ANTICIPATING ON BEING COMPLETE UNTIL 04-27-04. A REINSPECTION OF THIS SITE WILL BE DONE AT THAT TIME AND PRIOR TO APPROVING THE RELEASE OF ANY OF THESE LOTS. DENIED FOR NO ACCESS BY FIRE. |
| 05/25/2004 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by THAUSER1 - DRAINAGE WORK COMPLETE AT THIS TIME. COMPLETION BOND WILL BE REQUIRED FOR ALL REMAINING ITEMS (DRIVEWAYS, SIDEWALKS & SIGNS). tHIS INFORMATION WILL BE CHECKED AND VERIFIED PRIOR TO THE RELEASE OF THE ASSURANCES. BASIN DRAINAGE WILL BE CHECKED PRIOR TO THE RELEASE OF ALL REMAINING BONDS FOR THIS SITE. |
| 05/12/2004 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by THAUSER1 - PAVEMENT & UTILITIES. REMAINING MINOR WORK ON DRAINAGE WAYS. COMPLETION BOND REQUIRED PRIOR TO FINAL RELEASE. |
| 06/22/2004 |
COT - ENGR - Site - Assurance Release |
DROBERTS |
Partial Approval |
Entered by THAUSER1 - THE DRAINAGE WAYS, PAVEMENT SIGNS AND UTILITITES HAVE BEEN COMPLETED ON THIS SITE. WITH THE PLACEMENT OF A COMPLETION GBOND, THE ASSURANCES COULD BE RELEASED. I AM SCHEDULED TO MEET WITH KEN BIENER LATER THIS WEEK TO DISCUSS THE QUANTITITES THAT HE IS TO PROVIDE: 10 HOUSES COMPLETED AT THIS TIME, 72 HOUSES REMAINING. |