Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP22-0298
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Partial pass on all buildings from the north side of buildings 5 and 6 to center of project. Mid large basin area to building 11 is completed including the large basin. | |
| 05/28/2025 | PDSD Site/Engineering Division - Landscaping | Partial Pass | 05/27/25, Partial pass on all buildings from the north side of buildings 5 and 6 to center of project. Mid large basin area to building 11 is completed including the large basin. 05/28/25, completed landscaping inspection up to the fence line between buildings 16 and 17. Area around building 17 and dog park areas need to be completed. |
|
| 06/03/2025 | PDSD Site/Engineering Division - Landscaping | Passed | All landscape is complete and in accordance with approved plans. | |
| 10/09/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready |