Inspection Status: Complete (Recurring)
Inspection History: COT - ENGR - Stormwater
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2023 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
No activity at this time |
| 06/09/2023 |
COT - ENGR - Stormwater |
|
Not Ready |
Stop by the site all I see is two stacks of pipe and no work being performed at this time so there are no no concerns at this time for this site |
| 06/12/2023 |
COT - ENGR - Stormwater |
|
Not Ready |
SITE WAS CHECKED TO VERIFY WHAT WILL BE HAPPENING IN THE FUTURE |
| 06/20/2023 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Contractors installing two rows of 24 inch DP for storm drain and one collar on the south end |
| 12/19/2023 |
COT - ENGR - Stormwater |
|
Passed |
The contractor he used shot Crete instead of Gabion basket. Was approved through the City Of Tucson engineering department. |