Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Final Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2023 | SITE - Stormwater Final Inspection | Passed | The contractor he used shot Crete instead of Gabion basket. Was approved through the City Of Tucson engineering department. |