Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 05/01/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Caldwell construction Greg |
|
| 10/12/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Remodel of existing building. Caldwell constructors. Entrance to site is locked. Contain all materials within site schedule inspections from development package permit on a regular basis and prior to final. |