Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 10/11/2024 |
|
|
Partial Pass |
Looked at the footer for a wall located at the southwest corner of the building, it is ready to be poured. Also a small crew has poured some sidewalk at the southeast corner of the site. |
| 10/24/2024 |
|
|
Partial Pass |
Contractor is good to pour the retaining wall to south of the building and just east of seventh Street |
| 10/29/2024 |
|
|
Partial Pass |
Contractor, good to board the two retaining walls coming off seventh Street |
| 12/19/2024 |
|
|
Passed |
|