Inspection History Details
Inspection Status: Canceled
Inspection History: Consultation SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2024 | Consultation SITE | Canceled | Canceled by project mgr. Will reschedule for Wednesday the 26th | |
| 06/26/2024 | Consultation SITE | Complete (Recurring) | Tucson water will be placing their water box into the sidewalk at the street, 10’ before the ADA ramp to,site and street. Ramp to dumpster is proposed at being as is with a 6’’ step at the last panel, I will get back to site super on this. |
|
| 08/12/2024 | Consultation SITE | Passed | Items from the last engendering final were gone over and repairs will be completed |