Inspection History Details
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP22-0272
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Read all work is shown on the approved plans, and all areas that are being disturbed will either have to be hydroseeding or have decompose granite placed upon them once all work is complete | |
08/04/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
10/03/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Provide documentation for the hydro seed placement of the area | |
10/05/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Contractor needs to provide invoice documentation for all Hydro Seeding that has been utilized on the site in the stockpile area. I have contacted Cal Shepherd with KEG and have asked him to provide me with this information. | |
10/27/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Complete this site as shown on the approved plans prior to calling this Inspection in again for another Grading Inspection. Provide the hydro seed documentation for the work that has been completed so the Native Plant Mix cab be verified. A site visit may be required before this can be Approved since there are question about the Application of the material. |