Inspection Status: Not Ready
Inspection History: COT - ENGR - Stormwater
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2024 |
COT - ENGR - Stormwater |
|
Not Ready |
Contractors using a rain day too wet to work out here |
| 02/15/2024 |
COT - ENGR - Stormwater |
|
Partial Pass |
Contractor is working on the 36 inch CMP pipe south end of the building five rows |
| 03/04/2024 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
contractor installed five rows of CMP pipe 300 lineal feet on the south west corner going east |
| 05/09/2024 |
COT - ENGR - Stormwater |
|
Partial Pass |
No concerns at this time. Everything looks good. |
| 07/09/2024 |
COT - ENGR - Stormwater |
|
Partial Pass |
contractor removed 36 inch CMP because of the damage. Replaced it with new CMP backfilling deal with Pattinson and top it off with .AB |
| 12/29/2023 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Walked site with Damion all set up and controls are in place for site will call inspection every 2 weeks for follow up inspections. |