Permit: DP22-0193

Parcel: 141176830


Addresses:

7471 S HOUGHTON RD


Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Permit Number - DP22-0193

Inspection Description - ENGR - Drainage Structures

Inspection Status - Partial Pass

Date Description Inspector Results Comments
03/18/2024 ENGR - Drainage Structures Partial Pass The contractor continues to install 32 inch corrugated steel pipe, five rows 120 lineal feet per row for storm drain. Cut the grade for the HEADWALL for the storm drain and had it tested by third-party for density. Contractor installing the steel for the retaining wall on the north end of the project.
03/20/2024 ENGR - Drainage Structures Partial Pass Contractor continuously installing the rebar for the retaining wall on the north end of the project he’s going to backfill the corrugated pipe 32 inch on the south end of the project.
04/03/2024 ENGR - Drainage Structures Partial Pass Contractor he’s going to grout the retaining wall on the north end of the project 140 lineal feet and rebar is per plan vertical number four rebar
05/20/2024 ENGR - Drainage Structures Partial Pass contractor grouted the first 4 foot for the trash enclosure. Contractor informed me that the floor and the footer for the trash enclosure was inspected by the building inspector
05/22/2024 ENGR - Drainage Structures Partial Pass rebar and lay-out good to pour 12” on center
05/22/2024 ENGR - Drainage Structures Passed
05/28/2024 ENGR - Drainage Structures Partial Pass OK to grout top course and the bond beam was placed per plan
06/10/2024 ENGR - Drainage Structures Partial Pass Contractor called me out to inspect the parking lot for the building because we’re pouring concrete using number for bars on 18 inch centers
06/20/2024 ENGR - Drainage Structures Partial Pass Contractors for me the HEADWALL for the 36 inch CMP East End of it. Good to pour.
07/01/2024 ENGR - Drainage Structures Partial Pass Contractor needs to remove and replace 32 inch CMP pipe that was damaged 20 feet of it on the south end of the building
07/15/2024 ENGR - Drainage Structures Partial Pass Contractors go to pour the West parking lot. Rebar’s laid out per plan.
07/25/2024 ENGR - Drainage Structures Partial Pass Contractor called me out for a concrete pour under the canopy and a section of bad concrete pour on the south side of the building
07/25/2024 ENGR - Drainage Structures Partial Pass Contractor called me out for a concrete pour under the canopy and a section of bad concrete pour on the south side of the building
08/06/2024 ENGR - Drainage Structures Passed
08/06/2024 ENGR - Drainage Structures Passed