Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - DP22-0193
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2024 | ENGR - Drainage Structures | Partial Pass | The contractor continues to install 32 inch corrugated steel pipe, five rows 120 lineal feet per row for storm drain. Cut the grade for the HEADWALL for the storm drain and had it tested by third-party for density. Contractor installing the steel for the retaining wall on the north end of the project. | |
| 03/20/2024 | ENGR - Drainage Structures | Partial Pass | Contractor continuously installing the rebar for the retaining wall on the north end of the project he’s going to backfill the corrugated pipe 32 inch on the south end of the project. | |
| 04/03/2024 | ENGR - Drainage Structures | Partial Pass | Contractor he’s going to grout the retaining wall on the north end of the project 140 lineal feet and rebar is per plan vertical number four rebar | |
| 05/20/2024 | ENGR - Drainage Structures | Partial Pass | contractor grouted the first 4 foot for the trash enclosure. Contractor informed me that the floor and the footer for the trash enclosure was inspected by the building inspector | |
| 05/22/2024 | ENGR - Drainage Structures | Partial Pass | rebar and lay-out good to pour 12” on center | |
| 05/22/2024 | ENGR - Drainage Structures | Passed | ||
| 05/28/2024 | ENGR - Drainage Structures | Partial Pass | OK to grout top course and the bond beam was placed per plan | |
| 06/10/2024 | ENGR - Drainage Structures | Partial Pass | Contractor called me out to inspect the parking lot for the building because we’re pouring concrete using number for bars on 18 inch centers | |
| 06/20/2024 | ENGR - Drainage Structures | Partial Pass | Contractors for me the HEADWALL for the 36 inch CMP East End of it. Good to pour. | |
| 07/01/2024 | ENGR - Drainage Structures | Partial Pass | Contractor needs to remove and replace 32 inch CMP pipe that was damaged 20 feet of it on the south end of the building | |
| 07/15/2024 | ENGR - Drainage Structures | Partial Pass | Contractors go to pour the West parking lot. Rebar’s laid out per plan. | |
| 07/25/2024 | ENGR - Drainage Structures | Partial Pass | Contractor called me out for a concrete pour under the canopy and a section of bad concrete pour on the south side of the building | |
| 07/25/2024 | ENGR - Drainage Structures | Partial Pass | Contractor called me out for a concrete pour under the canopy and a section of bad concrete pour on the south side of the building | |
| 08/06/2024 | ENGR - Drainage Structures | Passed | ||
| 08/06/2024 | ENGR - Drainage Structures | Passed |