Permit: DP22-0187

Parcel: 11706162B


Addresses:

75 N 1ST AV


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP22-0187

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
02/02/2024 ENGR Engineering Final Not Ready Correct grade in areas that are puddling on site and in walkways. Standing water is present in center basin and in all three sediment traps. Monitor basin to assure proper operation. Correct erosion and provide stabilization. Replace dead plants and tree steaks as needed. Remove abandoned, temporary Stormwater controls and debris.
02/15/2024 ENGR Engineering Final Partial Pass
02/15/2024 ENGR Engineering Final Partial Pass Complete corrections as noted for ponding and stabilization of eroded areas and complete clean-up as needed.
02/15/2024 ENGR Engineering Final Partial Pass Complete corrections as noted for ponding within accessible DG walkway and provide stabilization of eroded areas. Remove remaining abandoned, stormwater, controls, and construction debris.
All duplicate inspections have been passed. Please reschedule remaining final inspections.
Chris, Durazzo Construction at 520-223-1880.
02/29/2024 ENGR Engineering Final Passed
02/29/2024 ENGR Engineering Final Passed
02/29/2024 ENGR Engineering Final Passed
10/18/2023 ENGR Engineering Final Partial Pass
10/18/2023 ENGR Engineering Final Partial Pass