Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP22-0187
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
02/02/2024 | ENGR Engineering Final | Not Ready | Correct grade in areas that are puddling on site and in walkways. Standing water is present in center basin and in all three sediment traps. Monitor basin to assure proper operation. Correct erosion and provide stabilization. Replace dead plants and tree steaks as needed. Remove abandoned, temporary Stormwater controls and debris. | |
02/15/2024 | ENGR Engineering Final | Partial Pass | ||
02/15/2024 | ENGR Engineering Final | Partial Pass | Complete corrections as noted for ponding and stabilization of eroded areas and complete clean-up as needed. | |
02/15/2024 | ENGR Engineering Final | Partial Pass | Complete corrections as noted for ponding within accessible DG walkway and provide stabilization of eroded areas. Remove remaining abandoned, stormwater, controls, and construction debris. All duplicate inspections have been passed. Please reschedule remaining final inspections. Chris, Durazzo Construction at 520-223-1880. |
|
02/29/2024 | ENGR Engineering Final | Passed | ||
02/29/2024 | ENGR Engineering Final | Passed | ||
02/29/2024 | ENGR Engineering Final | Passed | ||
10/18/2023 | ENGR Engineering Final | Partial Pass | ||
10/18/2023 | ENGR Engineering Final | Partial Pass |