Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
Permit Number - DP22-0170
Inspection Description - ENGR Engineering Final
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/09/2024 | ENGR Engineering Final | Partial Pass | Accessible spaces at new showroom | |
06/20/2024 | ENGR Engineering Final | Partial Pass | Hyundai building | |
10/17/2023 | ENGR Engineering Final | Not Ready | ||
11/22/2024 | ENGR Engineering Final | Not Ready | ADA ramp correction required per site visit. | |
12/19/2023 | ENGR Engineering Final | Not Ready | Ron with Concord. For TCO of new building provide safe access with separation from construction areas and completion of necessary building requirements. Schedule inspections for both the building combination permit and the development package permits when ready. | |
12/22/2023 | ENGR Engineering Final | Not Ready | Ron with Concord is looking for a TCO for building two. Striping is incomplete at this time. |