Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP22-0167
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2024 | ENGR Engineering Final | Passed | ||
03/26/2024 | ENGR Engineering Final | Passed | protective plastic covering should be removed from stippled pedestrian sidewalk transitions. | |
04/20/2023 | ENGR Engineering Final | Complete (Recurring) | Angel, ok to use final inspection code for trash enclosure footing, pre-grout and pre slab inspections. | |
09/26/2023 | ENGR Engineering Final | Not Ready | site still under construction. currently struggling with ADA com-liane issues. suggested contacting S. Blood for guidance. | |
09/27/2023 | ENGR Engineering Final | Not Ready | ||
10/13/2023 | ENGR Engineering Final | Not Ready | superintendent on site William. Complete remaining work and address all outstanding issues. Please schedule all inspections from development package permit. | |
10/16/2023 | ENGR Engineering Final | Partial Pass | OK for Level TCO for this site final not to be given to all work has been completed as previously discussed in the field prior to this date and on this date |