Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2023 | ENGR Engineering Final | Not Ready | COMPLETE THIS SITE AS SHOWN ON THE APPROVED PLANS | |
| 06/22/2023 | ENGR Engineering Final | Not Ready | ||
| 06/23/2023 | ENGR Engineering Final | Not Ready | Accessible parking is out of compliance; excessive slope. Accessible path To neighboring business has obstruction, curb at existing dumpster location. properly secure trees as noted and Install accessible signage per plan details. Complete all work shown on plan as required. |
|
| 07/10/2023 | ENGR Engineering Final | Partial Pass | Contractor still needs to install handicap signs and markers on the asphalt and roll the handicap parking on the far east side. It’s a little bit out of compliance. | |
| 07/13/2023 | ENGR Engineering Final | Not Ready | Complete as Previously discussed | |
| 08/08/2023 | ENGR Engineering Final | Passed |