Inspection Status: Complete (Recurring)
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 03/22/2023 |
ENGR - Drainage Structures |
|
Complete (Recurring) |
Contractor needs to add some walls along the front of the building on Broadway also inform the contractor to call us every two weeks for inspections |
| 04/07/2023 |
ENGR - Drainage Structures |
|
Not Ready |
|
| 05/18/2023 |
ENGR - Drainage Structures |
|
Complete (Recurring) |
Contractor needs to install two weed bars in the front for the trash enclosure one on each end |
| 05/22/2023 |
ENGR - Drainage Structures |
|
Complete (Recurring) |
Rebar layout for trash enclosure good |
| 08/03/2023 |
ENGR - Drainage Structures |
|
Not Ready |
The bond beams not in, and the vertical rebar has not been installed yet. Contractor will take photos and send them to me when they’re installed today. |
| 08/09/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor set the steel for the trash enclosure floor good to pour |
| 09/20/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor installed rebar for pole foundations. Good at this time. |
| 12/18/2023 |
ENGR - Drainage Structures |
|
Passed |
|