Inspection History Details
Inspection Status: Requested
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP22-0147
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Requested
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
SITE - Stormwater Follow-up | Requested | |||
06/12/2024 | SITE - Stormwater Follow-up | Partial Pass | No concerns at this time for the STORMWATER | |
06/24/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
07/09/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
07/15/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | BMP's have been repaired and site is in good shape. Main basin is being held up,by Tucson Water so it cannot be finished and is in urgent status. | |
08/06/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Basin needs to be cleared out | |
09/24/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No Concerns at this time. The contractor is working in the basement installing pipe that goes out to the right away. All other other portions of the site is in compliance. | |
10/02/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Inspection was for the drainage pipe coming out of the basin on the south side about middle of the basin. Note: this basins bottom seams to be compacted quite tightly, it would probably be a good idea to rake it and loosen it up. Good possibility that it will have a hard time percolating as is. |
|
10/14/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No rain occurrence for the last 14 days |