Inspection Status: Not Ready
Inspection History: COT - BASN - Drainage/Basin - Condition Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 09/26/2024 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Not Ready |
|
| 10/17/2024 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Complete (Recurring) |
Basins are cut and still in production. Channels into the basins are being formed, drainage pipe is in place, head walls still need to be installed. |
| 12/16/2024 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Passed |
good condition and new 12/16/2024 |
| 12/16/2024 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Passed |
good condition and new 12/16/2024 |