Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP22-0147
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2024 | ENGR Engineering Final | Not Ready | ||
12/02/2024 | ENGR Engineering Final | Canceled | ||
12/13/2024 | ENGR Engineering Final | Partial Pass | ADA parking not to plan Water harvesting not to plan All other finals need to be scheduled on the development permit. A TCO2 can be applied for |
|
12/16/2024 | ENGR Engineering Final | Not Ready | Once all items have been removed from site and all other inspections have been corrected this can be signed off. Remove port a Jon's, dumpster, temp electrical pole and finish all,other inspections. | |
ENGR Engineering Final | Scheduled |