Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP22-0147
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | ENGR Engineering Final | Passed | ||
| 03/05/2024 | ENGR Engineering Final | Not Ready | ||
| 12/02/2024 | ENGR Engineering Final | Canceled | ||
| 12/13/2024 | ENGR Engineering Final | Partial Pass | ADA parking not to plan Water harvesting not to plan All other finals need to be scheduled on the development permit. A TCO2 can be applied for |
|
| 12/16/2024 | ENGR Engineering Final | Not Ready | Once all items have been removed from site and all other inspections have been corrected this can be signed off. Remove port a Jon's, dumpster, temp electrical pole and finish all,other inspections. | |
| 12/24/2024 | ENGR Engineering Final | Partial Pass | TCO4 is approved with following conditions, ensure any employee and clients are protected from on going construction due to changes being made to water harvesting areas by means of a temporary type of safety fence. | |
| ENGR Engineering Final | Not Ready | Analysis of DG required prior to final. Per meeting on-site. |