Permit: DP22-0136

Parcel: 118080340

Inspection Status: Not Ready

Inspection History

Date Description Inspector Results Comments
08/13/2026 Not Ready 24" HDPE pipe on North side between the 2 type 4 catch basins. The 24" drainpipe needs to be adjusted so that it runs downslope consistent at approximately 0.2% to the storage chambers. There is a hump where water will pool. Also there is a torn rib in last section to west that needs to be patched. Reschedule inspection for tomorrow to verify these are fixed.
08/14/2026 Partial Pass 24" HDPE 265' run at North side of site between the 2 STD 309 type 4 catch basins is correct. Picture of damaged rib repaired will be provided. Okay to backfill. Schedule inspections for remaining drainpipe before backfilling and when Catch basins are formed with reinforcing ready.
08/17/2026 Partial Pass 18" HDPE between CB 1 and CB 1A. North half, approximately 70' is bedded and .2% slope correct. Okay to backfill as needed.
18" HDPE 1st section on north end, between CB 2 and CB3 set and bedded to correct elevation and .2% slope.
08/18/2026 Partial Pass The 18" HDPE south half of the run between CB1 and CB1A is bedded and sloped correct. Okay to backfill up to the catch basin.
08/19/2026 Not Ready 18" drain pipe in front of construction entrance between catch basin 2 and 3-Slope and elevation is correct at CB2 but as the pipe goes south it progressively gets steeper until it is over 1% slope. At the end of last section the invert elevation is higher than specified by survey. This will need to be fixed. Schedule inspection when ready.