Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP22-0134
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/30/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
01/11/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Had meeting with James Fay from Big D Construction and Project Manager and Site Superintendent from Granite Construction. Site is grubbed and construction site fenced areas will be lined with Wattle staked and overlapping. All Rip Rap channels are to be called in to view filter fabric as it is being constructed. All Storm water Pipe will also be called in during construction to view and inspect, 24” and 36” are called out on plan. Every 2 weeks James Fay will call in for follow up site inspections. |