Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Grading Final
Permit Number - DP22-0134
Inspection Description - ENGR Grading Final
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/25/2024 | ENGR Grading Final | Partial Pass | Grading in progress and Terracon is on site testing compaction. | |
02/08/2024 | ENGR Grading Final | Partial Pass | Grading continues thru out entire site and milled asphalt is in process from existing asphalt rd. to construction trailer located at the NE section of site for dust control and temporary parking purposes. | |
02/22/2024 | ENGR Grading Final | Partial Pass | Grade is at Blue top for the 167,000 sq. ft. building pad and basin channel located at the East side of site is cut and storm water basin is cut located at the NW section of site. No concerns at this time. |
|
03/14/2024 | ENGR Grading Final | Partial Pass | Grade in progress, I’ll leave this open for any other concerns or open inspections that might be needed. | |
11/26/2024 | ENGR Grading Final | Partial Pass |