Inspection Status: Canceled
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/13/2025 |
ENGR Engineering Final
|
|
Canceled |
|
| 03/12/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Partial pass, TCO4 is good. Wall above entry and drainage needs to be completed. Rear north side of the plane yard needs to be cleaned out and hydro seeded. |
| 03/14/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Left to Finnish will be only the north west corner of the property with either be a hydro seed or a mill product. |
| 06/03/2025 |
ENGR Engineering Final
|
|
Passed |
Everything is completed and per plan |