Inspection Status: Passed
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 03/12/2025 |
|
|
Passed |
This pipe was put in place prior to plans being approved. Inspections were made using the same criteria used on the rest of the project. |
| 06/05/2024 |
|
|
Partial Pass |
RCP pipe from detention to north west of the fence line, exterior of fence on this trip. |
| 06/13/2024 |
|
|
Partial Pass |
|
| 06/25/2024 |
|
|
Partial Pass |
Continued inspection of stormwater pipes being installed, dock drain to 12’’ going to 32’’ |
| 06/26/2024 |
|
|
Complete (Recurring) |
|
| 07/10/2024 |
|
|
Complete (Recurring) |
|
| 08/21/2024 |
|
|
Complete (Recurring) |
Thermoplastic 24” piping for roof drainage at north end for shop roof drains. |