Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2024 | ENGR - Drainage Structures | Partial Pass | Should be very close to this being the last of the drainage structures and pipe. |