Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - NPPO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2023 | PDSD Site/Engineering Division - NPPO | Not Ready | 1) Gave the go-ahead to paint rails 2) Trash enclosure has been raised to 65” 3) Gave the go-ahead to finish landscaping. 4) Handicap meets pitch requirements and signs are also good. Final inspection will be next week looking for TCO4 |
|
| 11/13/2023 | PDSD Site/Engineering Division - NPPO | Passed |