Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP22-0129

Parcel: 136261310


Addresses:

2775 S WILMOT RD


Inspection Status: Not Ready

Inspection History: Final inspection to ensure all landscape and water harvesting SITE

Permit Number - DP22-0129

Inspection Description - Final inspection to ensure all landscape and water harvesting SITE

Inspection Status - Not Ready

Date Description Inspector Results Comments
11/09/2023 Final inspection to ensure all landscape and water harvesting SITE Not Ready The contractor is working on installing the last Of the landscaping and installing the DG as needed throughout the site. I have brought it to their attention that the water harvesting areas are not deep enough and will need to be increased in depth. Per the approved plans there is to be 6-9 inches of free board space above the decomposed granite below the lowest inlet structure within the area. This Inspection will be rescheduled for Monday of next week by the prime Contractor.
11/13/2023 Final inspection to ensure all landscape and water harvesting SITE Passed