Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP22-0129
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/31/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | The basin in the landscaping is not completed yet, but they’re still working on it | |
11/09/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | The contractor is working on installing the last Of the landscaping and installing the DG as needed throughout the site. I have brought it to their attention that the water harvesting areas are not deep enough and will need to be increased in depth. Per the approved plans there is to be 6-9 inches of free board space above the decomposed granite below the lowest inlet structure within the area. This Inspection will be rescheduled for Monday of next week by the prime Contractor. | |
11/13/2023 | PDSD Site/Engineering Division - Landscaping | Passed |