Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP22-0123
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 01/25/2024 | ENGR Grading Final | Partial Pass | Paving in progress | |
| 02/01/2024 | ENGR Grading Final | Passed | OK to start planting and spreading groundcover | |
| 02/22/2024 | ENGR Grading Final | Passed | ||
| 05/17/2023 | ENGR Grading Final | Complete (Recurring) | 7 ft.² Ballard’s, and number four rebar 32 inches on center required for trash enclosure | |
| 05/18/2023 | ENGR Grading Final | Partial Pass | Trash enclosure, footing and bollards. Also V channel between buildings and stormwater drain from catch basin to basin inlet, OK | |
| 05/24/2023 | ENGR Grading Final | Partial Pass | Grading at water harvesting basin | |
| 06/02/2023 | ENGR Grading Final | Complete (Recurring) | ||
| 06/06/2023 | ENGR Grading Final | Partial Pass | Pre-grout | |
| 06/14/2023 | ENGR Grading Final | Complete (Recurring) | ||
| 06/22/2023 | ENGR Grading Final | Partial Pass | Trash enclosure | |
| 07/10/2023 | ENGR Grading Final | Partial Pass | contractor has not started grading the parking lot or the driveways. So it’s a reoccurring inspection. | |
| 08/04/2023 | ENGR Grading Final | Partial Pass | ||
| 08/04/2023 | ENGR Grading Final | Partial Pass | Mark and Ian on site. | |
| 08/04/2023 | ENGR Grading Final | Partial Pass | The site walls | |
| 08/04/2023 | ENGR Grading Final | Passed | site walls | |
| 09/22/2023 | ENGR Grading Final | Passed | Final grading, and curb installation in progress | |
| 11/17/2023 | ENGR Grading Final | Partial Pass | Valley gutters installed at 2% slope as shown | |
| 12/12/2023 | ENGR Grading Final | Partial Pass | ||
| 12/14/2023 | ENGR Grading Final | Partial Pass |