Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 03/11/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 03/11/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 11/29/2023 |
ENGR Engineering Final
|
|
Partial Pass |
The landscape is not completed. The rocks on the driveway need to be placed. Where they have put the septic tank area needs to be in hydroseed it and on the right side of the driveway, he needs to be a hydroseed it. |