Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP22-0106
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 12/05/2022 | ENGR Engineering Final | Complete (Recurring) | Reschedule for tomorrow not ready for inspection | |
| 12/13/2022 | ENGR Engineering Final | Complete (Recurring) | Inform the contractor that they needed three rebars at every corner and two at the doorway they can grout it on Thursday |