Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 04/17/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Complete (Recurring) |
Nobody would let me in at the gate I press the call at the gate and no answer The owner of the property Called and asked if I would come back for the pre-con. Informed. The owner that they need to call in for inspections every two weeks. |
| 07/05/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
I called the contractor nobody answers the phone and you need a gate access number to get in. I left him a message to reschedule for tomorrow. |
| 07/06/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
|