Permit: DP22-0089

Parcel: 14039052E

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
05/30/2024 ENGR Engineering Final Not Ready Contractor is waiting for the revisions for Tucson fire
05/30/2024 ENGR Engineering Final Not Ready Contractors waiting for Tucson fires inspections because there’s revisions to the project.
09/03/2024 ENGR Engineering Final Passed Everything is completed, fire final today will close this out.
09/03/2024 ENGR Engineering Final Passed Everything is completed, fire final today will close this out.