Permit: DP22-0081

Parcel: 141366860

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP22-0081

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/14/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 7531 S WILMOT RD
10/14/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 7401 S WILMOT RD
10/14/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 7303 S WILMOT RD
10/14/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 6670 E CAMINO BOLEADORAS
10/14/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 6591 E CAMINO BOLEADORAS
08/04/2023 ENGR Grading Final Not Ready Grading areas have been noted, recall for inspection when completed per approved plans.
09/29/2023 ENGR Grading Final Not Ready
09/29/2023 ENGR Grading Final Not Ready Complete this site as shown on the Approved Plans prior to Re-scheduling this Inspection
09/29/2023 ENGR Grading Final Not Ready This area is located between Via Bombachas and Paseo Alga to Paseo Monte De Oro to be approved after assurances and engineering finals are completed.
09/29/2023 ENGR Grading Final Not Ready This area is located between Via Bombachas and Paseo Alga to Paseo Monte De Oro to be approved after assurances and engineering finals are completed.
09/29/2023 ENGR Grading Final Not Ready This Final Approval wii be completed when all of the Sign work for this site has been Installed and Approved by DTM and their Private Improvement Agreement
10/04/2023 ENGR Grading Final Not Ready
10/04/2023 ENGR Grading Final Not Ready
10/27/2023 ENGR Grading Final Not Ready Complete this site as shown on the approved plans prior to calling this Inspection in again for another Grading Inspection.
10/27/2023 ENGR Grading Final Not Ready West parcel (6) there are only curbs and no sidewalks the pads on Paseo Alga to Paseo Obelo are completed and have utilities, The pads on Paseo Monte De Oro and Paseo Alga to Via Bombachas are completed with utilities.

On Paseo Baranda lots 67 thru 75 are frame completed and lot 71 and 72 are Lath completed.

Lots 65 and 66 are in framing stage.

Lots 62,63,64 are at slab poured stage.
10/27/2023 ENGR Grading Final Not Ready West parcel (6) there are only curbs and no sidewalks the pads on Paseo Alga to Paseo Obelo are completed and have utilities, The pads on Paseo Monte De Oro and Paseo Alga to Via Bombachas are completed with utilities.

On Paseo Baranda lots 67 thru 75 are frame completed and lot 71 and 72 are Lath completed.

Lots 65 and 66 are in framing stage.

Lots 62,63,64 are at slab poured stage.
10/28/2022 ENGR Grading Final Partial Pass
10/28/2022 ENGR Grading Final Partial Pass
10/28/2022 ENGR Grading Final Partial Pass
10/28/2022 ENGR Grading Final Partial Pass
10/28/2022 ENGR Grading Final Partial Pass