Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP22-0081
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 7531 S WILMOT RD |
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 7401 S WILMOT RD |
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 7303 S WILMOT RD |
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 6670 E CAMINO BOLEADORAS |
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 6591 E CAMINO BOLEADORAS |
08/04/2023 | ENGR Grading Final | Not Ready | Grading areas have been noted, recall for inspection when completed per approved plans. | |
09/29/2023 | ENGR Grading Final | Not Ready | ||
09/29/2023 | ENGR Grading Final | Not Ready | Complete this site as shown on the Approved Plans prior to Re-scheduling this Inspection | |
09/29/2023 | ENGR Grading Final | Not Ready | This area is located between Via Bombachas and Paseo Alga to Paseo Monte De Oro to be approved after assurances and engineering finals are completed. | |
09/29/2023 | ENGR Grading Final | Not Ready | This area is located between Via Bombachas and Paseo Alga to Paseo Monte De Oro to be approved after assurances and engineering finals are completed. | |
09/29/2023 | ENGR Grading Final | Not Ready | This Final Approval wii be completed when all of the Sign work for this site has been Installed and Approved by DTM and their Private Improvement Agreement | |
10/04/2023 | ENGR Grading Final | Not Ready | ||
10/04/2023 | ENGR Grading Final | Not Ready | ||
10/27/2023 | ENGR Grading Final | Not Ready | Complete this site as shown on the approved plans prior to calling this Inspection in again for another Grading Inspection. | |
10/27/2023 | ENGR Grading Final | Not Ready | West parcel (6) there are only curbs and no sidewalks the pads on Paseo Alga to Paseo Obelo are completed and have utilities, The pads on Paseo Monte De Oro and Paseo Alga to Via Bombachas are completed with utilities. On Paseo Baranda lots 67 thru 75 are frame completed and lot 71 and 72 are Lath completed. Lots 65 and 66 are in framing stage. Lots 62,63,64 are at slab poured stage. |
|
10/27/2023 | ENGR Grading Final | Not Ready | West parcel (6) there are only curbs and no sidewalks the pads on Paseo Alga to Paseo Obelo are completed and have utilities, The pads on Paseo Monte De Oro and Paseo Alga to Via Bombachas are completed with utilities. On Paseo Baranda lots 67 thru 75 are frame completed and lot 71 and 72 are Lath completed. Lots 65 and 66 are in framing stage. Lots 62,63,64 are at slab poured stage. |
|
10/28/2022 | ENGR Grading Final | Partial Pass | ||
10/28/2022 | ENGR Grading Final | Partial Pass | ||
10/28/2022 | ENGR Grading Final | Partial Pass | ||
10/28/2022 | ENGR Grading Final | Partial Pass | ||
10/28/2022 | ENGR Grading Final | Partial Pass |