Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP22-0081
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 7531 S WILMOT RD |
10/14/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 7401 S WILMOT RD |
10/14/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 7303 S WILMOT RD |
10/14/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 6670 E CAMINO BOLEADORAS |
10/14/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 6591 E CAMINO BOLEADORAS |
02/02/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
02/02/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Lots on paseo Alga have very minimal run off onto street with no construction at this time. Lots under construction on Paseo Barranda are hit hard by the rain with very minimal run off onto street areas. No concerns at this time. |
|
02/06/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
02/06/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
02/17/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
03/17/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
05/03/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
05/03/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
05/10/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
05/10/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | This site has been inspected for the Stormwater and there are no concerns at this time. This site will be re-inspected next week to verify how close it is to being completed. | |
06/23/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
06/23/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time. Call every two weeks for inspections. | |
08/04/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Stormwater controls are set in place, some slight runoff areas are noted. | |
08/04/2023 | SITE - Stormwater Follow-up | Not Ready | Wattle is still in process of being setup. | |
09/01/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Multiple areas on site have runoff on sidewalks, curbs, and streets that need attention. | |
09/01/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Multiple areas on site have runoff on sidewalks, curbs, and streets that need attention. | |
09/29/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time, work is just beginning | |
09/29/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
09/29/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
10/04/2023 | SITE - Stormwater Follow-up | Re-inspection required | ||
10/04/2023 | SITE - Stormwater Follow-up | Re-inspection required | 1) Stormwater drainage is full of overgrown weeds and needs to be maintained. | |
10/27/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time, call an inspection every two weeks through the remainder of the project | |
10/28/2022 | SITE - Stormwater Follow-up | Re-inspection required | ||
10/28/2022 | SITE - Stormwater Follow-up | Re-inspection required | ||
10/28/2022 | SITE - Stormwater Follow-up | Re-inspection required | ||
10/28/2022 | SITE - Stormwater Follow-up | Re-inspection required | ||
10/28/2022 | SITE - Stormwater Follow-up | Re-inspection required | ||
11/01/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | All lots grading is completed and lots are ready for build. No concerns at this time. | |
11/01/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Parcel 6 lot grading looks good. storm water no concerns. All lots are ready for build. | |
12/22/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans. | |
12/22/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans. |