Permit: DP22-0081

Parcel: 141366860

Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP22-0081

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
10/14/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 7531 S WILMOT RD
10/14/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 7401 S WILMOT RD
10/14/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 7303 S WILMOT RD
10/14/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 6670 E CAMINO BOLEADORAS
10/14/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 6591 E CAMINO BOLEADORAS
02/02/2024 SITE - Stormwater Follow-up Complete (Recurring)
02/02/2024 SITE - Stormwater Follow-up Complete (Recurring) Lots on paseo Alga have very minimal run off onto street with no construction at this time.

Lots under construction on Paseo Barranda are hit hard by the rain with very minimal run off onto street areas.

No concerns at this time.
02/06/2023 SITE - Stormwater Follow-up Complete (Recurring)
02/06/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
02/17/2023 SITE - Stormwater Follow-up Complete (Recurring)
03/17/2023 SITE - Stormwater Follow-up Complete (Recurring)
05/03/2023 SITE - Stormwater Follow-up Complete (Recurring)
05/03/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
05/10/2024 SITE - Stormwater Follow-up Complete (Recurring)
05/10/2024 SITE - Stormwater Follow-up Complete (Recurring) This site has been inspected for the Stormwater and there are no concerns at this time. This site will be re-inspected next week to verify how close it is to being completed.
06/23/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
06/23/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time. Call every two weeks for inspections.
08/04/2023 SITE - Stormwater Follow-up Complete (Recurring) Stormwater controls are set in place, some slight runoff areas are noted.
08/04/2023 SITE - Stormwater Follow-up Not Ready Wattle is still in process of being setup.
09/01/2023 SITE - Stormwater Follow-up Complete (Recurring) Multiple areas on site have runoff on sidewalks, curbs, and streets that need attention.
09/01/2023 SITE - Stormwater Follow-up Complete (Recurring) Multiple areas on site have runoff on sidewalks, curbs, and streets that need attention.
09/29/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time, work is just beginning
09/29/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
09/29/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
10/04/2023 SITE - Stormwater Follow-up Re-inspection required
10/04/2023 SITE - Stormwater Follow-up Re-inspection required 1) Stormwater drainage is full of overgrown weeds and needs to be maintained.
10/27/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time, call an inspection every two weeks through the remainder of the project
10/28/2022 SITE - Stormwater Follow-up Re-inspection required
10/28/2022 SITE - Stormwater Follow-up Re-inspection required
10/28/2022 SITE - Stormwater Follow-up Re-inspection required
10/28/2022 SITE - Stormwater Follow-up Re-inspection required
10/28/2022 SITE - Stormwater Follow-up Re-inspection required
11/01/2023 SITE - Stormwater Follow-up Complete (Recurring) All lots grading is completed and lots are ready for build. No concerns at this time.
11/01/2023 SITE - Stormwater Follow-up Complete (Recurring) Parcel 6 lot grading looks good. storm water no concerns. All lots are ready for build.
12/22/2023 SITE - Stormwater Follow-up Complete (Recurring) Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans.
12/22/2023 SITE - Stormwater Follow-up Complete (Recurring) Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans.