Inspection Status: Passed
Inspection History: COT - ENGR - Stormwater
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2024 |
COT - ENGR - Stormwater |
|
Passed |
All completed per plan |
| 06/24/2024 |
COT - ENGR - Stormwater |
|
Passed |
|
| 08/15/2023 |
COT - ENGR - Stormwater |
|
Not Ready |
Contractors going to reschedule |
| 09/14/2023 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Looked over the site and the on going work, there are no concerns at this time, no track out noted on the Streets |
| 09/20/2023 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
The storm water is good cal Portland is washing out on the ground .informed the contractor that he need a washout area. |
| 09/27/2023 |
COT - ENGR - Stormwater |
|
Partial Pass |
Time for the manhole storm drain 24 inch pipe good to pour |
| 09/28/2023 |
COT - ENGR - Stormwater |
|
Partial Pass |
Pouring the floor for the storm drain on the south west end of the building. It’s good to pour. |
| 10/06/2023 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
80’ of 8” pipe bedded and ready for backfill located at SE corner between canopy and site wall. |
| 10/17/2023 |
COT - ENGR - Stormwater |
|
Not Ready |
Will be recalled for 10/18/23 |
| 10/18/2023 |
COT - ENGR - Stormwater |
|
Not Ready |
|