Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 07/28/2023 |
ENGR Grading Final |
|
Requested |
|
| 07/28/2023 |
ENGR Grading Final |
|
Requested |
|
| 06/27/2023 |
ENGR Grading Final |
|
Complete (Recurring) |
No concerns about the grading.informed the contractor to call in inspection every two weeks. |
| 07/28/2023 |
ENGR Grading Final |
|
Not Ready |
Complete all work on this side is shown on the approved plans. This will be including Whitlock limited to all roadways all driveways, all curbs, all landscaping, call drainage-ways, etc……… |
| 08/24/2023 |
ENGR Grading Final |
|
Partial Pass |
Contractor for the footers, the trash enclosure |
| 09/08/2023 |
ENGR Grading Final |
|
Not Ready |
The floor, and the apron for the trash enclosure is not ready to be poured, yet still needs more grading and rebar |
| 11/15/2023 |
ENGR Grading Final |
|
Passed |
|
| 11/15/2023 |
ENGR Grading Final |
|
Passed |
|
| 11/15/2023 |
ENGR Grading Final |
|
Passed |
|