Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP22-0072
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
03/16/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time everything looks good | |
03/24/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Ok to backfilling the 24 storm drain on the east side of the building. | |
03/28/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Installed 12 inch HDP pipe on the northside of the building good backfield. | |
04/03/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Contractor formed up for the floors on 2-12” inch pipes and 3 -24 inch pipe | |
04/05/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Forming up fresh for catch basins two on the north side and one on the east side and one on the south east side good rapport | |
05/01/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
06/27/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | no concerns at is time | |
11/15/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | The basins and water harvesting areas are not completed yet | |
11/16/2023 | SITE - Stormwater Follow-up | Re-inspection required | No concerns at this time. Still implementing storm water systems. | |
12/15/2023 | SITE - Stormwater Follow-up | Passed |