Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Follow-up
|
|
Not Ready |
|
| 07/12/2023 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
|
| 07/14/2023 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
Provide stormwater controls as needed. They are needed at the curb cuts along the Unfinished basin. |
| 08/08/2023 |
SITE - Stormwater Follow-up
|
|
Passed |
|
| 08/08/2023 |
SITE - Stormwater Follow-up
|
|
Passed |
|
| 12/01/2022 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
The crews have worked on installing the vertical curb for the roadway on the north side of this site. They are planning on playing the asphalt for the roadway in the next two weeks once they have completed the compaction of the ABC. |