Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2023 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/05/2023 |
ENGR Engineering Final
|
|
Not Ready |
exterior still not complete. solid waste roll-off and portable johns still present. |
| 10/11/2023 |
ENGR Engineering Final
|
|
Not Ready |
still underconstruction |
| 10/13/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Complete the side of sun on the approved plans address all ADA issues prior to calling in for final inspection |
| 10/13/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Ok for a Level 2, Level four not to be given until All stock piles of excess material have been removed from the drivable areas and 88 compliancy from the streets to the building I’ve been achieved |
| 10/16/2023 |
ENGR Engineering Final
|
|
Partial Pass |
OK for a Level 4 TCO at this time, a full C of O is not to be given till all work has been completed as shown on the Approved plans, Inspected and Approved |
| 12/15/2023 |
ENGR Engineering Final
|
|
Passed |
|