Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Preconstruction meeting with Geoff at global general contractors 602-921-1768 and Andy project manager at 970-260-3672. Also Frank with RLS consulting. And Eric demolition contractor. Schedule inspections biweekly for Stormwater follow up and when ready for trash enclosure. Follow City of Tucson standard detail. Comply with plan specifications for water, harvesting and other aspects. Design changes require revisions. Saguaros noted as existing or not on site and are presumed stolen. Contact Right Of way Inspector for work outside of property boundaries. Provide stormwater controls as needed. |
|
| 06/27/2023 | PDSD Site/Engineering Division - Landscaping | Complete (Recurring) | Grading | |
| 07/27/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Rough grading only at this time | |
| 09/29/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Irrigation | |
| 10/04/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 10/04/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 10/04/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | ||
| 10/13/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Complete all landscaping is shown on the approved plans prior to calling in for final inspection | |
| 10/13/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 12/15/2023 | PDSD Site/Engineering Division - Landscaping | Passed |