Inspection Status: Partial Pass
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/18/2024 |
ENGR Grading Final |
|
Partial Pass |
sidewalk areas located on East, West, and South areas of parking lot are formed graded and compacted and are to be poured on 01/19/24 |
| 10/18/2024 |
ENGR Grading Final |
|
Re-inspection required |
Cars will have to be moved from the ADA parking areas prior to being able to inspect. |
| 10/22/2024 |
ENGR Grading Final |
|
Passed |
|
| 11/17/2023 |
ENGR Grading Final |
|
Not Ready |
Spoke to Alex explained the DP inspection is for the sidewalks he will call in when that work starts. |