Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP22-0033
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
01/18/2024 | ENGR Grading Final | Partial Pass | Double trash enclosure located on SW end of site #4 horizontal rebar for apron and mat is completed per COT requirements and ready for concrete pour. | |
03/14/2024 | ENGR Grading Final | Partial Pass | Verified (27) parking structure column footers at a 6’ depth and 2’ diameter located at North, NW, and NE sections of parking lot areas. | |
05/14/2024 | ENGR Grading Final | Not Applicable | ||
05/14/2024 | ENGR Grading Final | Passed | ||
05/14/2024 | ENGR Grading Final | Passed | ||
05/24/2023 | ENGR Grading Final | Complete (Recurring) | Setting number six steel for the footers for trash enclosures one on the north Eastside and the other one is on the south east side | |
06/07/2023 | ENGR Grading Final | Complete (Recurring) | Grading for trash enclosures good | |
06/09/2023 | ENGR Grading Final | Partial Pass | The inspection today it was utilized to look at the trash and closures on the north east and south east corners of the site. The contractor has constructed the lower 4 feet and will be grabbing that this coming week and then will continue with the upper portions of the trash and enclosure. | |
06/12/2023 | ENGR Grading Final | Complete (Recurring) | Contractor is good to grout the first 4 feet of trash enclosures the one on the southwest side and the one on the northwest side trash enclosures. | |
06/14/2023 | ENGR Grading Final | Complete (Recurring) | Contractor is grouting the last 4 foot of the trash and closure the one on the north west corner and the one on the south west corner | |
06/25/2024 | ENGR Grading Final | Partial Pass | Water flow from parking lot and building have washed out the drainage areas in several spots impacting basin, this was after one storm. 1) left side of building at lot drain to basin. 2) Both left side roof drains 3) All rear roof drains. |
|
07/09/2024 | ENGR Grading Final | Passed | Letter from engineer has been received and this inspection can be considered as passed. | |
07/11/2024 | ENGR Grading Final | Passed | July 11th, 2024. Engineers letter has been received | |
07/13/2023 | ENGR Grading Final | Not Ready | Reschedule for tomorrow for rebar and grading | |
07/14/2023 | ENGR Grading Final | Partial Pass | ok to pour the trash enclosure located at the southwest corner of the site north of the PCL Construction job trailer for the Water Department site | |
08/21/2023 | ENGR Grading Final | Partial Pass | Good to pour the floor for trash enclosure ONTHE south east side of the building. | |
08/25/2023 | ENGR Grading Final | Complete (Recurring) | SW trash enclosure grout complete and ready to be capped. The North end of SW courtyard trench and 12” pipe are ready for backfill. |
|
08/29/2023 | ENGR Grading Final | Complete (Recurring) | South East center of courtyard (2) 20’ trench sections completed with shading and 12” pipe ready for backfill. | |
08/31/2023 | ENGR Grading Final | Not Ready | ||
09/18/2023 | ENGR Grading Final | Partial Pass | Pole foundations, for the carports are good to pour | |
11/09/2022 | ENGR Grading Final | Complete (Recurring) | 9152 stormwater installation of control installed 24 inch DP’s | |
11/09/2022 | ENGR Grading Final | Complete (Recurring) | 9152 stormwater insulation of control 24 inch DP | |
12/07/2023 | ENGR Grading Final | Partial Pass | all rebar is present for floor mat 12” oc and dobies are in place, and has been inspected by 3rd party Western Technologies and is ready for concrete. |